All
- All
- Commercial Building
- Sports & Recreation Facilities
- Healthcare & Medical
- Residential & Strata
- Education
- Government
- Aged Care & Disability
- Hospitality Entertainment
- Places of Worship
- Industrial Warehouse
St George centre of Excellence (The Bruce Gordon Centre)
Scope of Works: Complete FDCIE & BOWS System Installation.Building Description: A state-of-the-art $65 million Community and High-Performance Centre that serves as the official headquarters and training base for the St George Illawarra Dragons NRL and NRLW teams.
Project Category: New Build Construction.
Lane Cove Sports & Recreation Centre (Galuwa Recreation Centre)
Scope of Works: Complete FDCIE & BOWS System Installation.Building Description: A $80 million ultramodern indoor & outdoor sports facility, complete with 8 courts, an onsite restaurant, underground parking & golf pro shop.
Project Category: New Build Construction.
Brent Street Performing Arts
Scope of Works: Design, installation & certification for Wet & Dry fire services.Building description: New dance studios, acoustic music rooms, administration offices, training rooms & reception area. Works completed in two separate jobs/buildings both located inside the Entertainment Quarter in Moore Park.
Project Category: Fitout .
Various Medical Fitouts
We have successfully completed over 100+ speciality medical fitouts for 5 different healthcare specialist companies, in many different health hubs, hospitals & retail complexes throughout Sydney.Types: Doctors, Dentist, Veterinary, Allied health, Cosmetic, Specialist clinics.
Services Provided: CDC Designs & Documentation, complete Wet & Dry Fire Installation & Certification.
St George Private & Public Hospital
Scope of Works: FDCIE & EWIS System Installation in the Pritchard Wing + dry fire fitout for all levels. Dry Fire Fitout Works for levels 4 & 6 in the Tower Ward Building. Dry Fire Fitout Works for level 1 in the Acute Services Building.Project Category: Fitout & FDCIE & EWIS Installation.
81-83 Florence St – Hornsby
Council Fire Order Works – Interpreted & applied the council fire order documentation & fire engineering report, submitted a fire services design. Supplied & installed a Fire Detection & Occupant Warning System & all new Emergency Lighting & Exit Signs throughout. Tested & commissioned all on completion Liaised with all parties to help the building complete the fire order works within the allocated time set by council.
102-104 Bannockburn Rd Pymble
Scope of works: Complete end to end DRY & WET Fire Installation. Installed a Fire Detection & BOWS system throughout, installed Fire Sprinklers in the allocated areas, Fire Hydrants and Fire Hose Reels to meet compliance requirements. Supplied all applicable documentation & baseline data, attended fire brigade & council inspections.
Building description: ‘Strathmore’ located in Pymble is a boutique multi-block Seniors Living Development from well-known local developers, Caxton Property Group.
Project category: New Build Construction.
7 Clement Street Rushcutters Bay Nsw 2011
Council Fire Order Works – Interpreted & applied the council fire order documentation & fire engineering report, submitted a fire services design. Supplied & installed a wireless Fire Detection & Alarm System in the common areas + Unit Smoke Alarms. Tested & commissioned all on completion Liaised with all parties to help the building complete the fire order works.
The Hills Grammar School
Fire Detection & BOWS system Design, installations & Commissioning for 12 separate buildings in a phased end-to-end upgrade. To ensure absolute safety with zero disruption to school operations, our team strategically executed the rollout in phases, installing 1 or 2 addressable fire systems during consecutive school holiday periods. Every new panel was seamlessly integrated into the school’s existing high-speed fibre network backbone, ensuring robust, campus-wide communication and full compliance.
Lane Cove Sports & Recreation Centre – Lane Cove Council
Scope of works: Complete FDCIE & BOWS System Installation.
Building description: A $80 million Ultramodern indoor & outdoor sports facility, complete with 8 courts, an onsite restaurant, underground parking & golf pro shop.
Project category: New Build Construction.
Sydney Water Harrington Park Pump Station
Scope of works: Complete FDCIE & BOWS System Installation.
Building description: A key regional water infrastructure asset designed to transfer drinking water and connect the Narellan South and Oran Park reservoirs as part of the Prospect to Macarthur (ProMac) project. The facility provides provide drinking water services for 84,000 new homes in the area. Fire Vision Services met the key project deadlines all whilst ensuring absolute compliance to the specific requirements of an industrial government infrastructure project.
Project category: New Build Construction.
Entertainment Quarter Brent Street Dance Performing Arts Centre
Scope of works: Design, installation & certification for Wet & Dry fire services.
Building description: New dance studios, acoustic music rooms, administration offices, training rooms & reception area. Works completed in two separate jobs/buildings both located inside the Entertainment Quarter in Moore Park.
Project category: Fitout.
Pyrmont Bridge Hotel
Council Fire Order Works – Interpreted & applied the council fire order documentation & fire engineering report.
Supplied & installed a Fire Detection & Occupant Warning System throughout. As outlined in the jobs specific fire engineering requirements – we interfaced the existing difficult to access combined fire pump to have a remote start/ stop as well as a motorized shutoff valve to all activate & control at the fire panel. This was a custom-built piece of equipment seamlessly integrated into the new fire panel we installed.
Liaised with all parties to help the building complete the fire order works within the allocated time set by council & worked with the pub management to complete the works whilst keeping the venue open.
Sydney Waters Harrington Park Pump Station
Scope of works: Complete FDCIE & BOWS System Installation.
Building description: A key regional water infrastructure asset designed to transfer drinking water and connect the Narellan South and Oran Park reservoirs as part of the Prospect to Macarthur (ProMac) project. The facility provides provide drinking water services for 84,000 new homes in the area. Fire Vision Services met the key project deadlines all whilst ensuring absolute compliance to the specific requirements of an industrial government infrastructure project.
Project category: New Build Construction.